Casa » Heijunka Production Leveling

Heijunka Production Leveling

1960
  • Taiichi Ohno

Heijunka is the principle of production leveling or smoothing within the Sistema di produzione Toyota. It involves averaging out the production volume and mix over a fixed period to eliminate peaks and valleys in workload. This creates a predictable and stable manufacturing environment, which is a prerequisite for implementing Just-in-Time (JIT) and standardized work effectively.

Instead of producing products in large batches according to customer orders (e.g., all of Model A, then all of Model B), Heijunka dictates producing a mixed model sequence in smaller batches. For example, if the weekly demand is for 500 of Model A, 300 of Model B, and 200 of Model C, a traditional system might produce all 500 A’s, then 300 B’s, etc. A Heijunka system would create a repeating sequence like A-B-A-C-A-B-A… This levels the demand for upstream processes and suppliers, preventing the “bullwhip effect” where demand fluctuations are amplified up the supply chain.

To achieve this, Toyota developed tools like the “Heijunka box,” a visual scheduling tool used to manage the production of different models. Each slot in the box represents a time interval, and Kanban cards for different products are placed in the slots to dictate the production sequence. This leveling of both volume and mix reduces inventory, shortens lead times, and stabilizes the workload for employees and equipment. It is a crucial enabler of the entire TPS, as the stability it creates is necessary for JIT and Kaizen to function properly. Without Heijunka, the fluctuations in demand would require large buffer stocks, undermining the core principles of waste elimination.

UNESCO Nomenclature: 3306
– Industrial Engineering

Tipo

Abstract System

Disruption

Substantial

Utilizzo

Widespread Use

Precursors

  • concepts of production flow from henry ford’s assembly lines
  • need for stability to enable just-in-time production

Applicazioni

  • call center staff scheduling to match average call volumes
  • agile software development sprint planning to maintain a consistent velocity
  • restaurant kitchen prep routines to handle daily rush hours smoothly
  • university course scheduling to balance classroom and faculty utilization
  • grid energy distribution to smooth out demand peaks

Brevetti:

QUELLO

Potential Innovations Ideas

Livelli! Iscrizione richiesta

Per accedere a questo contenuto devi essere un membro di !Professionals (100% free)!

Iscriviti ora

Siete già membri? Accedi
Related to: heijunka, production leveling, production smoothing, lean produzione, toyota production system, mixed-model production, workload stability, kanban

Lascia un commento

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

DISPONIBILE PER NUOVE SFIDE
Mechanical Engineer, Project, Process Engineering or R&D Manager
Sviluppo efficace del prodotto

Disponibile per una nuova sfida con breve preavviso.
Contattami su LinkedIn
Plastic metal electronics integration, Design-to-cost, GMP, Ergonomics, Medium to high-volume devices & consumables, Lean Manufacturing, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485

Stiamo cercando un nuovo sponsor

 

La tua azienda o istituzione si occupa di tecnica, scienza o ricerca?
> inviaci un messaggio <

Ricevi tutti i nuovi articoli
Gratuito, no spam, email non distribuita né rivenduta

oppure puoi ottenere la tua iscrizione completa -gratuitamente- per accedere a tutti i contenuti riservati >Qui<

Historical Context

(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)

Related Invention, Innovation & Technical Principles

Torna in alto

Potrebbe anche piacerti