Casa » Muda, Muri, Mura (3 of the 7 Wastes)

Muda, Muri, Mura (3 of the 7 Wastes)

1960
  • Taiichi Ohno

The Toyota Production System is founded on the complete elimination of waste, categorized into 7 types, 3 main being described here: Muda (non-value-adding work), Muri (overburden), and Mura (unevenness). While Muda is the most commonly discussed, TPS recognizes that Muri and Mura are often the root causes of Muda and must be addressed first to achieve a truly lean system.

Muda (Waste) refers to any activity that consumes resources but creates no value for the customer. Taiichi Ohno originally identified seven types of Muda: Transport (unnecessary movement of products), Inventory (excess products and materials), Motion (unnecessary movement by people), Waiting (for the next production step), Overproduction (producing more than is needed), Over-processing (doing more work than necessary), and Defects (efforts causing rework or scrap). An eighth waste, unused human talent, is often added.

Mura (dislivelli) refers to inconsistency or irregularity in a process. It can be seen in fluctuating production schedules or inconsistent work methods, leading to periods of rushing followed by idleness. Mura is often addressed through Heijunka (production leveling), which smooths out the production mix and volume.

Muri (Sovraccarico) means overburdening equipment or operators by asking them to do more than their natural capacity allows. This can lead to safety issues, burnout, and defects. Muri is often caused by Mura and a lack of standardized work. The TPS philosophy emphasizes that eliminating Mura and Muri is essential for systematically and sustainably eliminating Muda. By creating a leveled, stable, and reasonably paced work environment, the conditions that generate waste (Muda) are removed at their source.

UNESCO Nomenclature: 3306
– Industrial Engineering

Tipo

Abstract System

Disruption

Foundational

Utilizzo

Widespread Use

Precursors

  • frank and lillian gilbreth’s time and motion studies
  • henry ford’s focus on waste reduction in his assembly lines
  • principles of scientific management by frederick winslow taylor

Applicazioni

  • software development (eliminating unused code, unnecessary features)
  • healthcare (reducing patient waiting times, redundant paperwork)
  • service industries (streamlining customer service processes)
  • logistics (optimizing delivery routes to eliminate wasted motion and fuel)
  • government administration (simplifying bureaucratic processes)

Brevetti:

QUELLO

Potential Innovations Ideas

Livelli! Iscrizione richiesta

Per accedere a questo contenuto devi essere un membro di !Professionals (100% free)!

Iscriviti ora

Siete già membri? Accedi
Related to: muda, muri, mura, waste elimination, lean produzione, sistema di produzione toyota, overproduction, kaizen

Lascia un commento

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

DISPONIBILE PER NUOVE SFIDE
Mechanical Engineer, Project, Process Engineering or R&D Manager
Sviluppo efficace del prodotto

Disponibile per una nuova sfida con breve preavviso.
Contattami su LinkedIn
Plastic metal electronics integration, Design-to-cost, GMP, Ergonomics, Medium to high-volume devices & consumables, Lean Manufacturing, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485

Stiamo cercando un nuovo sponsor

 

La tua azienda o istituzione si occupa di tecnica, scienza o ricerca?
> inviaci un messaggio <

Ricevi tutti i nuovi articoli
Gratuito, no spam, email non distribuita né rivenduta

oppure puoi ottenere la tua iscrizione completa -gratuitamente- per accedere a tutti i contenuti riservati >Qui<

Historical Context

(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)

Related Invention, Innovation & Technical Principles

Torna in alto

Potrebbe anche piacerti