The bathtub curve is a graphical model illustrating three phases of a product’s life in terms of failure rate. It starts with a high but decreasing ‘infant mortality’ rate, followed by a low, constant ‘useful life’ rate, and concludes with an increasing ‘wear-out’ rate. MTBF calculations using a constant failure rate (\(\lambda\)) are typically only valid during the central ‘useful life’ phase.
The Bathtub Curve
The bathtub curve provides a more nuanced view of reliability than a single, constant failure rate. The three distinct phases are:
1. Infant Mortality (or Early Life Failures): This initial period is characterized by a high failure rate that decreases over time. Failures are often due to manufacturing defects or installation errors. To mitigate this, manufacturers often perform ‘burn-in’ testing, operating products under stress to weed out weak units before they reach the customer.
2. Useful Life (or Random Failures): This is the longest phase, where the failure rate is low and relatively constant. Failures are considered random and unpredictable. The exponential distribution and the simple MTBF formula (\(MTBF = 1/\lambda\)) are most applicable here.
3. Wear-Out: In this final phase, the failure rate begins to increase as components start to degrade and fail due to aging, fatigue, or corrosion. This is the basis for preventive maintenance, where components are replaced before they are expected to enter this high-failure-rate period, ensuring continued system reliability.
Understanding which phase a system is in is crucial for making correct maintenance and replacement decisions.
Type
Disruption
Usage
Precursors
- actuarial life tables used in insurance
- weibull distribution analysis, developed by waloddi weibull
- studies on material fatigue and aging
- statistical quality control methods
Applications
- warranty period determination for consumer products
- burn-in testing for electronic components to screen out early failures
- preventive maintenance scheduling to replace parts before they enter the wear-out phase
- asset lifecycle management
Patents:
Potential Innovations Ideas
Professionals (100% free) Membership Required
You must be a Professionals (100% free) member to access this content.
AVAILABLE FOR NEW CHALLENGES
Mechanical Engineer, Project or R&D Manager
Available for a new challenge on short notice.
Contact me on LinkedIn
Plastic metal electronics integration, Design-to-cost, GMP, Ergonomics, Medium to high-volume devices & consumables, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485
We are looking for a new sponsor
Your company or institution is into technique, science or research ?
> send us a message <
Receive all new articles
Free, no spam, email not distributed nor resold
or you can get your full membership -for free- to access all restricted content >here<
Historical Context
The Bathtub Curve
(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)
Related Invention, Innovation & Technical Principles