SMED (Single-Minute Exchange of Die)

SMED

SMED (Single-Minute Exchange of Die)

Objectif :

SMED (Single-Minute Exchange of Die), afin de réduire considérablement le temps nécessaire au changement ou à l'installation des équipements, idéalement en moins de 10 minutes ("single-minute").

Comment il est utilisé :

Avantages

Inconvénients

Catégories :

Idéal pour :

SMED is widely applicable across various manufacturing sectors that necessitate rapid changeovers, particularly in industries such as automotive, aerospace, electronics, and food processing where production flexibility and responsiveness to market fluctuations are paramount due to high competitiveness. This methodology is particularly effective during the production planning and scheduling phases of projects, where teams collaborate in cross-functional groups, including engineers, production managers, and quality assurance personnel, to optimize the changeover process. For instance, in an automotive assembly line, implementing SMED can reduce the time taken for die changes from hours to mere minutes, enabling manufacturers to shift between different vehicle models more efficiently. Participants in SMED projects typically focus on mapping the current changeover process, identifying bottlenecks, and employing techniques like training operators to perform tasks in parallel with machine operation, thereby reducing idle time. Principes de l'allégement often intertwine with SMED practices, as both aim to minimize waste and enhance productivity; this can lead to significant reductions in work-in-progress inventory and enhanced product quality. Implementing SMED not only benefits manufacturers directly by lowering production costs and improving customer satisfaction through faster delivery times but also has broader implications such as contributing to sustainable manufacturing practices by reducing resource waste associated with larger production runs.

Principales étapes de cette méthodologie

  1. Identify all setup operations involved in the changeover process.
  2. Separate internal setup operations from external setup operations.
  3. Convert as many internal setup operations to external ones as possible.
  4. Streamline remaining internal setup operations for efficiency.
  5. Standardize setup procedures to ensure consistency.
  6. Implement visual aids and tools to assist in setup processes.
  7. Continuously train personnel on new setup procedures and practices.
  8. Regularly review and refine changeover processes for ongoing improvement.

Conseils de pro

  • Utilize pre-setup checklists to ensure all components for changeover are prepared in advance, minimizing time spent during the internal setup phase.
  • Implement color-coded tools and parts to increase operator awareness and reduce errors in the setup process, enhancing speed and accuracy of changeovers.
  • Conduct regular training sessions and simulations for operators on the changeover process to identify bottlenecks and continually improve operational efficiency.

Lire et comparer plusieurs méthodologies, nous recommandons le

> Référentiel méthodologique étendu  <
ainsi que plus de 400 autres méthodologies.

Vos commentaires sur cette méthodologie ou des informations supplémentaires sont les bienvenus sur le site web de la Commission européenne. section des commentaires ci-dessous ↓ , ainsi que toute idée ou lien en rapport avec l'ingénierie.

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *