Maison » Système Kanban

Système Kanban

1950
  • Taiichi Ohno

Kanban, meaning “visual card” or “signboard” in Japanese, is a scheduling system integral to the Système de production Toyota. It uses visual cues, typically cards, to trigger action and manage workflow. It is a “pull” system that signals the need to move materials within a manufacturing facility or from an outside supplier into the production facility.

The Kanban system was developed by Taiichi Ohno at Toyota to achieve Just-in-Time (JIT) manufacturing. The core idea is to limit the amount of work-in-progress (WIP) to avoid overproduction, a primary form of waste. In its simplest form, a Kanban card is attached to a container of parts. When a worker at a downstream station begins using parts from that container, they take the Kanban card and place it in a designated collection box. This card then serves as a signal to the upstream process to produce another container of the same parts.

There are two main types of Kanbans: a Production Kanban, which authorizes the production of a new batch of parts, and a Withdrawal (or Conveyance) Kanban, which authorizes the movement of parts from one poste de travail to another. The number of Kanban cards in circulation for a particular part directly controls the maximum amount of inventory for that part in the system. By carefully managing the number of cards, managers can control the flow and reduce WIP. The system’s visual nature makes it easy for everyone to understand the status of work and identify bottlenecks. This simplicity and visual control are key to its effectiveness in creating a smooth, efficient production flow.

UNESCO Nomenclature: 3306
– Industrial Engineering

Type

Abstract System

Disruption

Revolutionary

Utilisation

Widespread Use

Precursors

  • american supermarket inventory replenishment methods
  • two-bin inventory systems
  • the need for a simple signaling mechanism for just-in-time

Applications

  • Agile and SCRUM software development (kanban boards like trello, jira)
  • personal task management (to-do, doing, done lists)
  • content commercialisation workflow management
  • hospital patient flow management
  • supply chain inventory control systems

Brevets :

QUE

Potential Innovations Ideas

!niveaux !!! Adhésion obligatoire

Vous devez être membre de l'association pour accéder à ce contenu.

S’inscrire maintenant

Vous êtes déjà membre ? Connectez-vous ici
Related to: kanban, visual signal, pull system, lean fabrication, JIT, toyota production system, workflow management, WIP limit

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

DISPONIBLE POUR DE NOUVEAUX DÉFIS
Mechanical Engineer, Project, Process Engineering or R&D Manager
Développement de produits efficace

Disponible pour un nouveau défi dans un court délai.
Contactez-moi sur LinkedIn
Plastic metal electronics integration, Design-to-cost, GMP, Ergonomics, Medium to high-volume devices & consumables, Lean Manufacturing, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485

Nous recherchons un nouveau sponsor

 

Votre entreprise ou institution est dans le domaine de la technique, de la science ou de la recherche ?
> envoyez-nous un message <

Recevez tous les nouveaux articles
Gratuit, pas de spam, email non distribué ni revendu

ou vous pouvez obtenir votre adhésion complète - gratuitement - pour accéder à tout le contenu restreint >ici<

Historical Context

(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)

Related Invention, Innovation & Technical Principles

Retour en haut

Vous aimerez peut-être aussi