Takt time is a theoretical calculation representing the pace of customer demand ([latex]Available Time \div Demand[/latex]). In contrast, cycle time is an empirical measurement of the actual time taken to complete one unit of work at a specific process step. A core principle of lean manufacturing is to ensure that cycle time is consistently less than or equal to Takt time.
Distinction Between Takt Time and Cycle Time
The relationship between Takt time, cycle time, and lead time is critical. Takt time is what you need, cycle time is what you get, and lead time is the total time a customer must wait for a product. The primary diagnostic use of this distinction is in line balancing and bottleneck identification. By measuring the cycle time of every station on a line and comparing it to the Takt time, managers can instantly see where problems lie. Any station where Cycle Time > Takt Time is a bottleneck that constrains the entire system’s output. Efforts for improvement, or ‘kaizen’, should be focused on these bottleneck stations to reduce their cycle time.
Conversely, if a station’s Cycle Time < Takt Time, it has spare capacity. While this may seem good, it can lead to overproduction if not managed. The operator may finish their work early and produce extra units ‘just in case’, creating inventory that is not yet needed by the next station or the customer. The lean ideal is to balance the line so that the cycle time of each station is very close to, but just under, the Takt time. This creates a smooth, synchronized flow and maximizes labor efficiency without generating wasteful inventory.
类型
Disruption
使用方法
Precursors
- the theory of constraints developed by Eliyahu M. Goldratt
- development of performance metrics in industrial settings
- the concept of a bottleneck in production theory
- statistical process control methods for measuring process times
应用
- bottleneck analysis and management
- production capacity planning
- performance measurement for manufacturing cells
- guiding continuous improvement (kaizen) activities
- work balancing across multiple stations
专利:
迎接新挑战
机械工程师、项目或研发经理
可在短时间内接受新的挑战。
通过 LinkedIn 联系我
塑料金属电子集成、成本设计、GMP、人体工程学、中高容量设备和耗材、受监管行业、CE 和 FDA、CAD、Solidworks、精益西格玛黑带、医疗 ISO 13485
Historical Context
Distinction Between Takt Time and Cycle Time
(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)
Related Invention, Innovation & Technical Principles