Home » Weighted MVP Features Prioritizer™

Weighted MVP Features Prioritizer™

MVP Features Prioritizer™

The free MVP Features Prioritizer™ tool provides a structured interface for listing, categorizing, and organizing features relevant to the development of a Minimum Viable Product (MVP). Visualizations such as priority list and matrix display the relationship between core, optional, and backlog items versus effort to develop them. It is intended to be used as a real-time collaboration tool allowing team members to add or update features simultaneously.

Usage

  1. Enter your MVP features in the input field and the estimated impact (1 to 5) and estimated effort (1 to 5).
  2. Visualize the classifications, both in the list and in the matrix and negotiate with marketing.

Tips

  • Once entered, you can drag and drop each feature in the matrix, changing its impact and effort, thus updating the calculated score and classification.
  • Choose between addition or multiplication for the way you want to evaluate Impact versus effort. The “Addition” method also permits to chose for a precise weight ratio.
  • It can also serve to prioritize projects, like a simplified Pugh Matrix

Weighted MVP Features Prioritizer™

Weight = 1:1
Impact Effort

Prioritization Matrix

Y-Axis: Impact (High=Top) | X-Axis: Effort (Low=Left)

Quick Wins

Major Projects

Fill-ins

Reconsider

Weighted MVP Features Prioritizer™ - © 2025 https://innovation.world

Prioritized List

    Table of Contents
      添加页眉,开始生成目录

      DESIGN or PROJECT CHALLENGE?
      Mechanical Engineer, Project or R&D Manager
      Effective product development

      Available for a new challenge on short notice in France & Swiss.
      Contact me on LinkedIn
      Plastic & metal products, Design-to-cost, Ergonomics, Medium to high-volume, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485 Class II & III

      University ?
      Institution ?

      Would you like to become a partner of this site by hosting it?
      > send us a message <

      Receive all new articles
      Free, no spam, email not distributed nor resold

      or you can get your full membership -for free- to access all restricted content >here<

      Topics covered: MVP, features prioritization, collaboration tool, impact estimation, effort estimation, priority list, matrix visualization, Pugh Matrix, real-time updates, drag and drop, classification, structured interface, agile development, project prioritization, user interface design, user experience, software development lifecycle, ISO/IEC 25010, ISO/IEC 25012, ISO 9241-210, ISO 9241-110, and ISO 25000..

      Leave a Comment

      Your email address will not be published. Required fields are marked *

      Related Posts

      Scroll to Top

      You May Also Like