Successful Takt time implementation requires a highly stable production environment. Common challenges include managing machine downtime, ensuring consistent quality to avoid rework, and balancing lines that produce multiple products with different work contents (mixed-model lines). Without addressing these sources of variability, a Takt-driven system can be brittle and fail to meet demand consistently.
Takt Time Implementation Challenges
A system paced by Takt time has very little slack or buffer. This makes it highly efficient but also vulnerable to disruption. The first major challenge is reliability. If a machine breaks down, the entire line downstream of it starves for work, and the line cannot meet its Takt. This is why Total Productive Maintenance (TPM), a proactive approach to maintenance, is a crucial prerequisite for Takt time implementation.
The second challenge is quality. If a defective part is produced, it must be either scrapped or reworked. Both outcomes disrupt the flow. Rework, in particular, introduces unplanned work that consumes time and resources, making it impossible to adhere to the Takt rhythm. Therefore, robust in-process quality control methods, such as mistake-proofing (Poka-yoke) and the ability for any worker to stop the line (Andon), are essential.
Finally, product variety poses a significant challenge. If a line produces multiple products (a mixed-model line), and each product requires a different amount of work at each station, it becomes very difficult to balance the line. A simple Takt time calculation is insufficient. This requires more advanced techniques like creating a weighted-average Takt time and carefully sequencing the products (a practice known as Heijunka) to level the demand for work at each station over time.
Type
Disruption
Utilisation
Precursors
- practical experiences with failures on early assembly lines
- challenges in implementing mass production systems
- development of quality control theories by W. Edwards Deming and Joseph Juran
- early operations research on production scheduling and variability
Applications
- total productive maintenance (TPM) programs to increase machine uptime
- in-station quality control systems (jidoka, poka-yoke)
- mixed-model line balancing techniques
- cellular manufacturing design to isolate variability
- heijunka (production leveling) to smooth demand
Brevets :
Potential Innovations Ideas
!niveaux !!! Adhésion obligatoire
Vous devez être membre de l'association pour accéder à ce contenu.
DISPONIBLE POUR DE NOUVEAUX DÉFIS
Ingénieur mécanique, chef de projet ou de R&D
Disponible pour un nouveau défi dans un court délai.
Contactez-moi sur LinkedIn
Intégration électronique métal-plastique, Conception à coût réduit, BPF, Ergonomie, Appareils et consommables de volume moyen à élevé, Secteurs réglementés, CE et FDA, CAO, Solidworks, Lean Sigma Black Belt, ISO 13485 médical
Nous recherchons un nouveau sponsor
Votre entreprise ou institution est dans le domaine de la technique, de la science ou de la recherche ?
> envoyez-nous un message <
Recevez tous les nouveaux articles
Gratuit, pas de spam, email non distribué ni revendu
ou vous pouvez obtenir votre adhésion complète - gratuitement - pour accéder à tout le contenu restreint >ici<
Historical Context
Takt Time Implementation Challenges
(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)
Related Invention, Innovation & Technical Principles