Hogar » Distinction Between Takt Time and Cycle Time

Distinction Between Takt Time and Cycle Time

1960

Takt time is a theoretical calculation representing the pace of customer demand ([latex]Available Time \div Demand[/latex]). In contrast, cycle time is an empirical measurement of the actual time taken to complete one unit of work at a specific process step. A core principle of lean manufacturing is to ensure that cycle time is consistently less than or equal to Takt time.

The relationship between Takt time, cycle time, and lead time is critical. Takt time is what you need, cycle time is what you get, and lead time is the total time a customer must wait for a product. The primary diagnostic use of this distinction is in line balancing and bottleneck identification. By measuring the cycle time of every station on a line and comparing it to the Takt time, managers can instantly see where problems lie. Any station where Cycle Time > Takt Time is a bottleneck that constrains the entire system’s output. Efforts for improvement, or ‘kaizen’, should be focused on these bottleneck stations to reduce their cycle time.

Conversely, if a station’s Cycle Time < Takt Time, it has spare capacity. While this may seem good, it can lead to overproduction if not managed. The operator may finish their work early and produce extra units ‘just in case’, creating inventory that is not yet needed by the next station or the customer. The lean ideal is to balance the line so that the cycle time of each station is very close to, but just under, the Takt time. This creates a smooth, synchronized flow and maximizes labor efficiency without generating wasteful inventory.

UNESCO Nomenclature: 3308
– Industrial technology

Tipo

Abstract System

Disruption

Incremental

Utilización

Widespread Use

Precursors

  • the theory of constraints developed by Eliyahu M. Goldratt
  • development of performance metrics in industrial settings
  • the concept of a bottleneck in production theory
  • statistical process control methods for measuring process times

Aplicaciones

  • bottleneck analysis and management
  • production capacity planning
  • performance measurement for manufacturing cells
  • guiding continuous improvement (kaizen) activities
  • work balancing across multiple stations

Patentes:

ESO

Potential Innovations Ideas

Membresía obligatoria de Professionals (100% free)

Debes ser miembro de Professionals (100% free) para acceder a este contenido.

Únete ahora

¿Ya eres miembro? Accede aquí
Related to: takt time, cycle time, lead time, bottleneck, lean manufacturing, toyota production system, process improvement, capacity planning

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

DISPONIBLE PARA NUEVOS RETOS
Ingeniero Mecánico, Gerente de Proyectos o de I+D
Desarrollo eficaz de productos

Disponible para un nuevo desafío a corto plazo.
Contáctame en LinkedIn
Integración de electrónica de plástico y metal, diseño a coste, GMP, ergonomía, dispositivos y consumibles de volumen medio a alto, industrias reguladas, CE y FDA, CAD, Solidworks, cinturón negro Lean Sigma, ISO 13485 médico

Estamos buscando un nuevo patrocinador

 

¿Su empresa o institución se dedica a la técnica, la ciencia o la investigación?
> Envíanos un mensaje <

Recibe todos los artículos nuevos
Gratuito, sin spam, correo electrónico no distribuido ni revendido.

o puedes obtener tu membresía completa -gratis- para acceder a todo el contenido restringido >aquí<

Historical Context

(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)

Related Invention, Innovation & Technical Principles

Scroll al inicio

También te puede interesar