Maison » Work Breakdown Structure

Work Breakdown Structure

1957
  • United States Department of Defense (DoD)
  • NASA
Project management office with Work Breakdown Structure diagram for organizational methods.

A Work Breakdown Structure (sometimes abbreviated WBS) is a key project deliverable that organizes the team’s work into manageable sections. It is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. The WBS is a tree structure that shows a subdivision of effort required to achieve an objective, such as a program, project, or contract.

The Work Breakdown Structure (WBS) concept was developed by the U.S. Department of Defense in 1957 as part of the Polaris missile program, in conjunction with the Program Evaluation and Review Technique (PERT). Its primary innovation was to provide a systematic, deliverable-oriented way to deconstruct a large, complex project into smaller, more manageable components. The fundamental principle of the WBS is the ‘100% Rule,’ which states that the WBS must capture all the work defined in the project scope—and only the work in the scope. It represents the total effort and deliverables of the project.

The WBS is typically depicted as a hierarchical chart, resembling an organization chart. The top level (Level 1) represents the entire project. Subsequent levels break down the work into major deliverables or phases. The decomposition continues until the work is broken down into ‘work packages,’ which are the lowest level of the WBS. A work package is a piece of work that can be realistically estimated, scheduled, and assigned to an individual or a team. To complement the visual chart, a WBS dictionary is often created. This document provides detailed information about each WBS element, including a description of the work, deliverables, budget, schedule, and assigned responsibility. The WBS is not a schedule or a plan, but rather the foundation upon which schedules, cost estimates, and resource plans are built. It provides a common cadre for all project stakeholders, ensuring a clear and shared understanding of the project’s scope.

UNESCO Nomenclature: 5312
- Sciences de gestion

Taper

Système abstrait

Perturbation

Incrémentale

Usage

Utilisation généralisée

Précurseurs

  • Organizational charts
  • Systems engineering principles
  • Early military project planning techniques
  • Hierarchical decomposition concepts from mathematics and logic

Applications

  • cost estimating and budgeting
  • resource allocation
  • schedule development
  • la gestion des risques
  • procurement management
  • scope control and gestion du changement

Brevets:

NA

Idées d'innovations potentielles

!niveaux !!! Adhésion obligatoire

Vous devez être membre de l'association pour accéder à ce contenu.

S’inscrire maintenant

Vous êtes déjà membre ? Connectez-vous ici
Related to: work breakdown structure, WBS, project management, scope, deliverable, decomposition, work package, project planning, hierarchy, scope management.

Laisser un commentaire

Votre adresse e-mail ne sera pas publiée. Les champs obligatoires sont indiqués avec *

DISPONIBLE POUR DE NOUVEAUX DÉFIS
Ingénieur mécanique, chef de projet, ingénierie des procédés ou R&D
Développement de produits efficace

Disponible pour un nouveau défi dans un court délai.
Contactez-moi sur LinkedIn
Intégration électronique métal-plastique, Conception à coût réduit, BPF, Ergonomie, Appareils et consommables de volume moyen à élevé, Production allégée, Secteurs réglementés, CE et FDA, CAO, Solidworks, Lean Sigma Black Belt, ISO 13485 médical

Nous recherchons un nouveau sponsor

 

Votre entreprise ou institution est dans le domaine de la technique, de la science ou de la recherche ?
> envoyez-nous un message <

Recevez tous les nouveaux articles
Gratuit, pas de spam, email non distribué ni revendu

ou vous pouvez obtenir votre adhésion complète - gratuitement - pour accéder à tout le contenu restreint >ici<

Inventions, innovations et principes techniques connexes

Retour en haut

Vous aimerez peut-être aussi