Casa » Work Breakdown Structure

Work Breakdown Structure

1957
  • United States Department of Defense (DoD)
  • NASA
Project management office with Work Breakdown Structure diagram for organizational methods.

A Work Breakdown Structure (sometimes abbreviated WBS) is a key project deliverable that organizes the team’s work into manageable sections. It is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. The WBS is a tree structure that shows a subdivision of effort required to achieve an objective, such as a program, project, or contract.

The Work Breakdown Structure (WBS) concept was developed by the U.S. Department of Defense in 1957 as part of the Polaris missile program, in conjunction with the Program Evaluation and Review Technique (PERT). Its primary innovazione was to provide a systematic, deliverable-oriented way to deconstruct a large, complex project into smaller, more manageable components. The fundamental principle of the WBS is the ‘100% Rule,’ which states that the WBS must capture all the work defined in the project scope—and only the work in the scope. It represents the total effort and deliverables of the project.

The WBS is typically depicted as a hierarchical chart, resembling an organization chart. The top level (Level 1) represents the entire project. Subsequent levels break down the work into major deliverables or phases. The decomposition continues until the work is broken down into ‘work packages,’ which are the lowest level of the WBS. A work package is a piece of work that can be realistically estimated, scheduled, and assigned to an individual or a team. To complement the visual chart, a WBS dictionary is often created. This document provides detailed information about each WBS element, including a description of the work, deliverables, budget, schedule, and assigned responsibility. The WBS is not a schedule or a plan, but rather the foundation upon which schedules, cost estimates, and resource plans are built. It provides a common struttura for all project stakeholders, ensuring a clear and shared understanding of the project’s scope.

UNESCO Nomenclature: 5312
- Scienze gestionali

Tipo

Sistema astratto

Interruzione

Incrementale

Utilizzo

Uso diffuso

Precursori

  • Organizational charts
  • Systems engineering principles
  • Early military project planning techniques
  • Hierarchical decomposition concepts from mathematics and logic

Applicazioni

  • cost estimating and budgeting
  • resource allocation
  • schedule development
  • gestione del rischio
  • procurement management
  • scope control and gestione del cambiamento

Brevetti:

NA

Potenziali idee innovative

Livelli! Iscrizione richiesta

Per accedere a questo contenuto devi essere un membro di !Professionals (100% free)!

Iscriviti ora

Siete già membri? Accedi
Related to: work breakdown structure, WBS, project management, scope, deliverable, decomposition, work package, project planning, hierarchy, scope management.

Lascia un commento

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

DISPONIBILE PER NUOVE SFIDE
Ingegnere meccanico, responsabile di progetto, ingegneria di processo o ricerca e sviluppo
Sviluppo efficace del prodotto

Disponibile per una nuova sfida con breve preavviso.
Contattami su LinkedIn
Integrazione di componenti elettronici in plastica e metallo, progettazione in base ai costi, GMP, ergonomia, dispositivi e materiali di consumo di medio-alto volume, produzione snella, settori regolamentati, CE e FDA, CAD, Solidworks, Lean Sigma Black Belt, ISO 13485 in ambito medico

Stiamo cercando un nuovo sponsor

 

La tua azienda o istituzione si occupa di tecnica, scienza o ricerca?
> inviaci un messaggio <

Ricevi tutti i nuovi articoli
Gratuito, no spam, email non distribuita né rivenduta

oppure puoi ottenere la tua iscrizione completa -gratuitamente- per accedere a tutti i contenuti riservati >Qui<

Principi di invenzione, innovazione e tecnica correlati

Torna in alto

Potrebbe anche piacerti