Successful Takt time implementation requires a highly stable production environment. Common challenges include managing machine downtime, ensuring consistent quality to avoid rework, and balancing lines that produce multiple products with different work contents (mixed-model lines). Without addressing these sources of variability, a Takt-driven system can be brittle and fail to meet demand consistently.

A system paced by Takt time has very little slack or buffer. This makes it highly efficient but also vulnerable to disruption. The first major challenge is reliability. If a machine breaks down, the entire line downstream of it starves for work, and the line cannot meet its Takt. This is why Total Productive Maintenance (TPM), a proactive approach to maintenance, is a crucial prerequisite for Takt time implementation.

The second challenge is quality. If a defective part is produced, it must be either scrapped or reworked. Both outcomes disrupt the flow. Rework, in particular, introduces unplanned work that consumes time and resources, making it impossible to adhere to the Takt rhythm. Therefore, robust in-process quality control methods, such as mistake-proofing (Poka-yoke) and the ability for any worker to stop the line (Andon), are essential.

Finally, product variety poses a significant challenge. If a line produces multiple products (a mixed-model line), and each product requires a different amount of work at each station, it becomes very difficult to balance the line. A simple Takt time calculation is insufficient. This requires more advanced techniques like creating a weighted-average Takt time and carefully sequencing the products (a practice known as Heijunka) to level the demand for work at each station over time.

UNESCO Nomenclature: 3308
– Industrial technology

Tipo

Abstract System

Disruption

Incremental

Utilizzo

Widespread Use

Precursors

  • practical experiences with failures on early assembly lines
  • challenges in implementing mass production systems
  • development of quality control theories by W. Edwards Deming and Joseph Juran
  • early operations research on production scheduling and variability

Applicazioni

  • total productive maintenance (TPM) programs to increase machine uptime
  • in-station quality control systems (jidoka, poka-yoke)
  • mixed-model line balancing techniques
  • cellular manufacturing design to isolate variability
  • heijunka (production leveling) to smooth demand

Brevetti:

QUELLO

Potential Innovations Ideas

Livelli! Iscrizione richiesta

Per accedere a questo contenuto devi essere un membro di !Professionals (100% free)!

Iscriviti ora

Siete già membri? Accedi
Related to: takt time, implementation, downtime, quality control, mixed-model line, line balancing, lean manufacturing, production stability

Lascia un commento

Il tuo indirizzo email non sarà pubblicato. I campi obbligatori sono contrassegnati *

DISPONIBILE PER NUOVE SFIDE
Mechanical Engineer, Project, Process Engineering or R&D Manager
Sviluppo efficace del prodotto

Disponibile per una nuova sfida con breve preavviso.
Contattami su LinkedIn
Plastic metal electronics integration, Design-to-cost, GMP, Ergonomics, Medium to high-volume devices & consumables, Lean Manufacturing, Regulated industries, CE & FDA, CAD, Solidworks, Lean Sigma Black Belt, medical ISO 13485

Stiamo cercando un nuovo sponsor

 

La tua azienda o istituzione si occupa di tecnica, scienza o ricerca?
> inviaci un messaggio <

Ricevi tutti i nuovi articoli
Gratuito, no spam, email non distribuita né rivenduta

oppure puoi ottenere la tua iscrizione completa -gratuitamente- per accedere a tutti i contenuti riservati >Qui<

Historical Context

(if date is unknown or not relevant, e.g. "fluid mechanics", a rounded estimation of its notable emergence is provided)

Related Invention, Innovation & Technical Principles

Torna in alto

Potrebbe anche piacerti