A Work Breakdown Structure (sometimes abbreviated WBS) is a key project deliverable that organizes the team’s work into manageable sections. It is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. The WBS is a tree structure that shows a subdivision of effort required to achieve an objective, such as a program, project, or contract.
Work Breakdown Structure
- United States Department of Defense (DoD)
- NASA

The Work Breakdown Structure (WBS) concept was developed by the U.S. Department of Defense in 1957 as part of the Polaris missile program, in conjunction with the Program Evaluation and Review Technique (PERT). Its primary innovazione was to provide a systematic, deliverable-oriented way to deconstruct a large, complex project into smaller, more manageable components. The fundamental principle of the WBS is the ‘100% Rule,’ which states that the WBS must capture all the work defined in the project scope—and only the work in the scope. It represents the total effort and deliverables of the project.
The WBS is typically depicted as a hierarchical chart, resembling an organization chart. The top level (Level 1) represents the entire project. Subsequent levels break down the work into major deliverables or phases. The decomposition continues until the work is broken down into ‘work packages,’ which are the lowest level of the WBS. A work package is a piece of work that can be realistically estimated, scheduled, and assigned to an individual or a team. To complement the visual chart, a WBS dictionary is often created. This document provides detailed information about each WBS element, including a description of the work, deliverables, budget, schedule, and assigned responsibility. The WBS is not a schedule or a plan, but rather the foundation upon which schedules, cost estimates, and resource plans are built. It provides a common struttura for all project stakeholders, ensuring a clear and shared understanding of the project’s scope.
Tipo
Interruzione
Utilizzo
Precursori
- Organizational charts
- Systems engineering principles
- Early military project planning techniques
- Hierarchical decomposition concepts from mathematics and logic
Applicazioni
- cost estimating and budgeting
- resource allocation
- schedule development
- gestione del rischio
- procurement management
- scope control and gestione del cambiamento
Brevetti:
Potenziali idee innovative
Livelli! Iscrizione richiesta
Per accedere a questo contenuto devi essere un membro di !Professionals (100% free)!
DISPONIBILE PER NUOVE SFIDE
Ingegnere meccanico, responsabile di progetto, ingegneria di processo o ricerca e sviluppo
Disponibile per una nuova sfida con breve preavviso.
Contattami su LinkedIn
Integrazione di componenti elettronici in plastica e metallo, progettazione in base ai costi, GMP, ergonomia, dispositivi e materiali di consumo di medio-alto volume, produzione snella, settori regolamentati, CE e FDA, CAD, Solidworks, Lean Sigma Black Belt, ISO 13485 in ambito medico
Stiamo cercando un nuovo sponsor
La tua azienda o istituzione si occupa di tecnica, scienza o ricerca?
> inviaci un messaggio <
Ricevi tutti i nuovi articoli
Gratuito, no spam, email non distribuita né rivenduta
oppure puoi ottenere la tua iscrizione completa -gratuitamente- per accedere a tutti i contenuti riservati >Qui<
Principi di invenzione, innovazione e tecnica correlati