» 风险优先级编号(RPN)

风险优先级编号(RPN)

1970
Risk assessment meeting with engineers analyzing Risk Priority Numbers in a professional office.

The Risk Priority Number (RPN) is a quantitative measure used in FMEA to prioritize risks. It is calculated as the product of three ranked factors: Severity (S), Occurrence (O), and Detection (D). The formula is [latex]RPN = S times O times D[/latex]. Each factor is typically rated on a scale from 1 to 10, allowing teams to focus on the highest-scoring risks first.

The RPN provides a simple, numerical 方法 to rank the potential failure modes identified during an FMEA session. The three components are critical to its calculation. ‘Severity’ (S) assesses the seriousness of the end effect of the failure, with 1 being ‘no effect’ and 10 being ‘catastrophic failure with potential fatality’. ‘Occurrence’ (O) estimates the likelihood that a specific cause will occur and result in the failure mode, where 1 is ‘extremely unlikely’ and 10 is ‘inevitable’. ‘Detection’ (D) evaluates the ability of current controls to detect the cause or the failure mode before it reaches the customer, with 1 being ‘certain detection’ and 10 being ‘cannot be detected’.

While powerful, the RPN has known limitations. A key criticism is that different combinations of S, O, and D can yield the same RPN, yet represent vastly different risk profiles (e.g., S=10, O=2, D=2 gives RPN=40, and S=4, O=5, D=2 also gives RPN=40). The first case is a high-severity issue that should likely be addressed regardless of its low RPN. This has 引领 to the development of alternative prioritization methods, such as the Action Priority (AP) tables in the AIAG-VDA FMEA handbook, which prioritize actions based on combinations of S, O, and D rather than just their mathematical product.

UNESCO Nomenclature: 1209
- 统计资料

类型

软件/算法

中断

实质性

使用方法

广泛使用

前体

  • 故障模式和影响分析(FMEA)方法
  • 决策理论
  • 概率论
  • 定性风险评估技术

应用

  • 优先考虑制造过程中的纠正措施
  • assessing risks in 医疗器械 设计
  • evaluating 软件 bug severity
  • 管理项目风险
  • 环境影响评估

专利:

NA

潜在的创新想法

级别需要会员

您必须是!!等级!!会员才能访问此内容。

立即加入

已经是会员? 在此登录
Related to: RPN, risk priority number, FMEA, severity, occurrence, detection, risk assessment, quantitative analysis, quality engineering, risk matrix.

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注

迎接新挑战
机械工程师、项目、工艺工程师或研发经理
有效的产品开发

可在短时间内接受新的挑战。
通过 LinkedIn 联系我
塑料金属电子集成、成本设计、GMP、人体工程学、中高容量设备和耗材、精益制造、受监管行业、CE 和 FDA、CAD、Solidworks、精益西格玛黑带、医疗 ISO 13485

我们正在寻找新的赞助商

 

您的公司或机构从事技术、科学或研究吗?
> 给我们发送消息 <

接收所有新文章
免费,无垃圾邮件,电子邮件不分发也不转售

或者您可以免费获得完整会员资格以访问所有受限制的内容>这里<

历史背景

(如果日期不详或不相关,例如 "流体力学",则对其显著出现的时间作了四舍五入的估计)。

相关发明、创新和技术原理

滚动至顶部

你可能还喜欢