Product Design, Manufacturing & Innovation Resources
» 작업 분해 구조

작업 분해 구조

1957
  • United States Department of Defense (DoD)
  • NASA
조직 방식에 대한 작업 분류 구조 다이어그램이 있는 프로젝트 관리 사무실.

(설명을 위한 생성된 이미지입니다)

A Work Breakdown Structure (sometimes abbreviated WBS) is a key project deliverable that organizes the team’s work into manageable sections. It is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. The WBS is a tree structure that shows a subdivision of effort required to achieve an objective, such as a program, project, or contract.

The Work Breakdown Structure (WBS) concept was developed by the U.S. Department of Defense in 1957 as part of the Polaris missile program, in conjunction with the Program Evaluation and Review Technique (PERT). Its primary innovation was to provide a systematic, deliverable-oriented way to deconstruct a large, complex project into smaller, more manageable components. The fundamental principle of the WBS is the ‘100% Rule,’ which states that the WBS must capture all the work defined in the project scope—and only the work in the scope. It represents the total effort and deliverables of the project.

The WBS is typically depicted as a hierarchical chart, resembling an organization chart. The top level (Level 1) represents the entire project. Subsequent levels break down the work into major deliverables or phases. The decomposition continues until the work is broken down into ‘work packages,’ which are the lowest level of the WBS. A work package is a piece of work that can be realistically estimated, scheduled, and assigned to an individual or a team. To complement the visual chart, a WBS dictionary is often created. This document provides detailed information about each WBS element, including a description of the work, deliverables, budget, schedule, and assigned responsibility. The WBS is not a schedule or a plan, but rather the foundation upon which schedules, cost estimates, and resource plans are built. It provides a common framework for all project stakeholders, ensuring a clear and shared understanding of the project’s scope.

UNESCO Nomenclature: 5312
경영과학

유형

추상 시스템

분열

점진적

용법

널리 사용됨

전구체

  • Organizational charts
  • Systems engineering principles
  • Early military project planning techniques
  • Hierarchical decomposition concepts from mathematics and logic

응용 프로그램

  • cost estimating and budgeting
  • resource allocation
  • schedule development
  • risk management
  • procurement management
  • scope control and change management

특허:

NA

잠재적 혁신 아이디어

현재 하루 4만 건이 넘는 봇 트래픽을 차단하기 위해 이 콘텐츠는 커뮤니티 회원만 이용할 수 있습니다.
> 로그인 < 또는 >등록 < 이 콘텐츠를 비롯한 모든 제한된 콘텐츠와 도구는 (100% 무료로) 이용할 수 있습니다.

Related to: work breakdown structure, WBS, project management, scope, deliverable, decomposition, work package, project planning, hierarchy, scope management.

역사적 맥락

작업 분해 구조

1910
1914
1950
1957
1960
1960
1970
1890
1914
1942
1957
1957
1960
1965
1970

(날짜를 알 수 없거나 관련이 없는 경우, 예를 들어 "유체역학"의 경우, 주목할 만한 등장 시기를 대략적으로 추정하여 제공합니다.)

고화질 이미지 및 다운로드는 등록된 회원에게만 100% 무료로 제공됩니다.

> 로그인 <