Build Verification Test (BVT)

Build Verification Test

Build Verification Test (BVT)

Objetivo:

A set of tests run on every new build to verify that the build is testable before it is released to the testing team for further testing.

Cómo se utiliza:

Ventajas

Contras

Categorías:

Ideal para:

Build Verification Testing (BVT) is particularly relevant in the software development lifecycle, especially during the continuous integration phase, where numerous code changes are committed frequently. It is predominantly utilized in industries such as technology, telecommunications, automotive, and finance, where software plays a significant role in product functionality. Teams typically initiate BVT when a new build is created, and it involves developers, quality assurance engineers, and sometimes product managers in its execution. This methodology can be integrated into agile development frameworks and DevOps practices, serving as a preliminary gate before the build progresses to more rigorous testing phases like regression or system testing. Companies employing BVT often utilize automated testing tools and scripting capabilities, thereby ensuring that even minor updates or patches do not compromise the application’s core functionalities. The immediate feedback loop created by BVT encourages rapid iteration and problem-solving, reducing downtime and ensuring that development efforts are directed toward stable and functional code, which aligns with the fast-paced demands of modern software deployment.

Pasos clave de esta metodología

  1. Develop automated test cases that cover essential functionalities of the software.
  2. Integrate the test suite into the continuous integration/continuous deployment (CI/CD) pipeline.
  3. Trigger the Build Verification Test automatically upon each new software build.
  4. Execute the automated tests against the new build and capture results.
  5. Evaluate the test outcomes to determine if the build meets stability criteria.
  6. If the build fails, reject it and notify the development team for necessary adjustments.
  7. If the build passes, mark it as stable and proceed with further testing phases.

Consejos profesionales

  • Use version control integration to automatically trigger BVTs post-commit, enabling rapid feedback loops for developers.
  • Incorporate coverity scanning or static code analysis into the BVT process to catch potential issues early in the development cycle.
  • Implement metrics tracking to analyze BVT results over time, allowing for continuous improvement in testing coverage and efficiency.

Leer y comparar varias metodologías, recomendamos el

> Amplio repositorio de metodologías  <
junto con otras más de 400 metodologías.

Sus comentarios sobre esta metodología o información adicional son bienvenidos en la dirección sección de comentarios ↓ , así como cualquier idea o enlace relacionado con la ingeniería.

Deja una respuesta

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *

Publicaciones relacionadas

Scroll al inicio