The process of minimizing the time it takes to switch a التصنيع line or machine from producing one product to another.
- المنهجيات: الهندسة, تصميم المنتج, إدارة المشاريع
تقليل وقت التغيير

تقليل وقت التغيير
- إدارة التغيير, التحسين المستمر, الكفاءة, التصنيع اللين, الإنتاج المرن, تحسين العمليات, كفاءة الإنتاج, تبديل القالب في دقيقة واحدة (SMED), الحد من النفايات
الهدف:
كيفية استخدامه:
- Often using the سميد (Single-Minute Exchange of Die) methodology, this involves analyzing the entire changeover process to identify and streamline steps, converting internal (machine-off) tasks to external (machine-on) tasks.
الإيجابيات
- Increases production flexibility and capacity, reduces manufacturing lead times, allows for smaller batch sizes and less inventory.
السلبيات
- Requires significant time and effort for analysis and implementation, may require investment in new tools or equipment, and needs strong operator involvement and training.
الفئات:
- الهندسة, لين سيجما, التصنيع
الأفضل لـ
- Improving manufacturing efficiency by systematically reducing the downtime associated with production line changeovers.
Changeover Time Reduction through the SMED methodology has found its application across various industries, including automotive, aerospace, food and beverage, and electronics manufacturing, where the need for rapid response to market demands and customization is pronounced. This methodology is particularly effective during the design and implementation phases of manufacturing processes, especially when a company introduces new products or variations. Typically, a cross-functional team involving engineers, operators, and production managers initiates the changeover time reduction initiative, ensuring that diverse perspectives are captured to identify inefficiencies in the process. In practice, this involves detailed mapping of each step in the changeover, allowing teams to distinguish between internal tasks that require the machine to be stopped and external tasks that can be executed while the machine operates. Sources of inefficiencies may emerge from unnecessary adjustments or waiting times, which can be systematically addressed. Industries employing this methodology often report an improvement in production cycle times, enabling them to optimize resource allocation and enhance operational resilience. As a result, businesses can achieve heightened competitiveness by promoting just-in-time production philosophies, leading to more responsive supply chains and improved customer satisfaction.
الخطوات الرئيسية لهذه المنهجية
- Identify and map out the entire changeover process in detail.
- Distinguish between internal and external tasks involved in the changeover.
- Convert as many internal tasks as possible to external tasks.
- Eliminate non-value-added activities from the changeover process.
- Standardize and document procedures for the modified changeover process.
- Train operators on the new changeover procedures to ensure consistency.
- Implement the new changeover process and monitor its performance.
- Continuously seek feedback and make incremental improvements to the process.
نصائح للمحترفين
- Implement a detailed time study of each changeover step using video analysis to identify non-value-added activities.
- Collaborate with cross-functional teams, including operators and engineers, to develop standardized work procedures that maximize external setup tasks.
- Utilize visual management tools, such as control charts and scoreboards, to continuously track and improve changeover performance metrics.
لقراءة عدة منهجيات ومقارنتها, نوصي باستخدام
> مستودع المنهجيات الشامل <
مع أكثر من 400 منهجية أخرى.
نرحب بتعليقاتكم على هذه المنهجية أو المعلومات الإضافية على قسم التعليقات أدناه ↓، وكذلك أي أفكار أو روابط متعلقة بالهندسة.
منشورات ذات صلة
حاسبة METS إلى السعرات الحرارية
التحليل التلوي
تخطيط الرسائل
مخططات النموذج الذهني
الحد الأقصى لقوى الدفع والسحب المقبولة
تخطيط الاحتياجات المادية (MRP)