构建验证测试 (BVT)

Build Verification Test

构建验证测试 (BVT)

目标

A set of tests run on every new build to verify that the build is testable before it is released to the testing team for further testing.

如何使用

优点

缺点

类别

最适合:

Build Verification Testing (BVT) is particularly relevant in the software development lifecycle, especially during the continuous integration phase, where numerous code changes are committed frequently. It is predominantly utilized in industries such as technology, telecommunications, automotive, and finance, where software plays a significant role in product functionality. Teams typically initiate BVT when a new build is created, and it involves developers, quality assurance engineers, and sometimes product managers in its execution. This methodology can be integrated into agile development frameworks and DevOps practices, serving as a preliminary gate before the build progresses to more rigorous testing phases like regression or system testing. Companies employing BVT often utilize automated testing tools and scripting capabilities, thereby ensuring that even minor updates or patches do not compromise the application’s core functionalities. The immediate feedback loop created by BVT encourages rapid iteration and problem-solving, reducing downtime and ensuring that development efforts are directed toward stable and functional code, which aligns with the fast-paced demands of modern software deployment.

该方法的关键步骤

  1. Develop automated test cases that cover essential functionalities of the software.
  2. Integrate the test suite into the continuous integration/continuous deployment (CI/CD) pipeline.
  3. Trigger the Build Verification Test automatically upon each new software build.
  4. Execute the automated tests against the new build and capture results.
  5. Evaluate the test outcomes to determine if the build meets stability criteria.
  6. If the build fails, reject it and notify the development team for necessary adjustments.
  7. If the build passes, mark it as stable and proceed with further testing phases.

专业提示

  • Use version control integration to automatically trigger BVTs post-commit, enabling rapid feedback loops for developers.
  • Incorporate coverity scanning or static code analysis into the BVT process to catch potential issues early in the development cycle.
  • Implement metrics tracking to analyze BVT results over time, allowing for continuous improvement in testing coverage and efficiency.

阅读和比较几种方法、 我们建议

> 广泛的方法论资料库  <
以及其他 400 多种方法。

欢迎您就此方法发表评论或提供更多信息,请登录 下面的评论区 ↓ ,因此任何与工程相关的想法或链接都是如此。

发表回复

您的邮箱地址不会被公开。 必填项已用 * 标注

相关文章

滚动至顶部